Portfolio

  1. Home
  2. Portfolio
  3. Portfolio List
  4. Hilton Odawara Resort & Spa

Hilton Odawara Resort & Spa

B-1

  • Hilton Odawara Resort & Spa1
  • Hilton Odawara Resort & Spa2
  • Hilton Odawara Resort & Spa3
  • Hilton Odawara Resort & Spa4
  • Hilton Odawara Resort & Spa5
  • Hilton Odawara Resort & Spa6
Location 583-1 Nebukawa,Odawara-shi, Kanagawa
Site area 174,566.00 m² (Note 1)
Total floor area 50,605.67 m² (Note 2)
Structure/ Number of stories (Main facility)
Steel frame and steel reinforced concrete structure with deck roof and stainless steel plate roofing
12 floors above ground and 1 floor below ground
(Bade facility)
Reinforced concrete structure with deck roof and stainless steel plate roofing
3 floors above ground and 1 floor below ground
(Sports facility)
Reinforced concrete structure with air-supported roof
2 floors above ground and 1 floor below ground
(Chapel)
Steel frame structure with galvanized steel plate roofing
1 floor above ground
(Note 3)
Completion of construction October 1997 (Note 4)
Ownership form [Building]Ownership (50.0% quasi-co-ownership interest in the trust beneficiary interest)
[Land]Ownership (50.0% quasi-co-ownership interest in the trust beneficiary interest)
(Note1) For the site area of the Hilton Odawara Resort & Spa, the area of the entire site or land is stated. The quasi-co-ownership interest in the Hilton Odawara Resort & Spa owned by MORI TRUST Hotel Reit is 50%.
(Note2) For the floor area of the Hilton Odawara Resort & Spa, the grand total of total floor area for the entire buildings of the Hilton Odawara Resort & Spa is stated. The quasi-co-ownership interest in the Hilton Odawara Resort & Spa owned by MORI TRUST Hotel Reit is 50%.
(Note3) The structure and number of floors for the entire building of, of each building of the Hilton Odawara Resort & Spa, the main buildings for business use (the main facility, bade facility, sports facility and chapel) is stated.
(Note4) The completion of construction for, of each building of the Hilton Odawara Resort & Spa, the main buildings for business use (the main facility, bade facility and sports facility) is stated. The completion of construction for the chapel, the other main building for business use, is October 2004.

Location characteristics

■Located in a favorable resort area with convenient access being only 1 hour from the Tokyo metropolitan area.

Property characteristics

■High-quality building grade under the Hilton brand with all guestrooms offering ocean views.
■Extended-stay resort with natural hot spring baths, advanced sports facilities and amusement center.

MAP

Page Top